Buildings: 100,000 sq ft of Aircraft hangars Partial completion: December 2020 with continuing construction Product: MVRA900 to mitigate moisture migration in all of the concrete slabs that received epoxy coatings General Contractor and Construction Management: Conco Construction Concrete Producer: Andale Ready Mix
The MVRA900 admixture provided concrete moisture control that assured on time application of epoxy coatings with no moisture testing required.