St. Francis Hospital-Interquest
Location: Colorado Springs, CO
Product Used: MVRA 900
General Contractor: GE Johnson Construction Co.
Architect: Hunton Brady Architects
Our MVRA 900 moisture vapor mitigating admixture has been used in all concrete slabs for the new “hospital of the future” St. Francis Hospital-Interquest in City of Colorado Springs by Centura Health.
58 acre site. 72 beds, including 64 inpatient beds, eight critical care beds (which could be expanded to 24 beds), a 14-bed emergency department, 10 operating rooms with robotic equipment, and 30 beds for surgical preparation and recovery.
General Contractor GE Johnson Construction Company and Architect HuntonBrady Architects. Completion: Summer 2023.